Progress – APX East

  • Site Selection
  • SLTE equipment installation
  • PFE equipment installation
  • Submarine equipment test & commission
  • Submarine land cable installation
  • Submarine land cable test & commission
  • Site Selection
  • SLTE equipment installation
  • PFE equipment installation
  • Submarine equipment test & commission
  • Submarine land cable installation
  • Submarine land cable test & commission
  • Sydney PoP construction
  • California PoP construction
  • Site setup
  • Seaward drilling operations
  • Beach manhole construction
  • Landward duct construction
  • Site setup
  • Seaward drilling operations
  • Beach manhole construction
  • Landward duct construction
  • Carrier Licence
  • Environmental Impact Assessment
  • Non-Protection Zone permit
  • Protection Zone permit
  • State Government approvals
  • Occupation of Crown Lands
  • FCC Carrier Licence
  • State Government approvals
  • Regional Permit Applications
  • Australian Authority Notifications
  • USA Authority Notifications
  • Overview training
  • System Operations & Engineering training
  • NOC Training
  • California inshore survey
  • Fit-out
  • Deep sea survey
  • Sydney inshore survey
  • Preliminary survey report
  • Final survey report
  • Repeaters 25%
  • Repeaters 50%
  • Repeaters 75%
  • Repeaters 100%
  • Repeater testing
  • Branching Units
  • Branching Unit testing
  • Lightweight cable 25%
  • Lightweight cable 50%
  • Lightweight cable 75%
  • Lightweight cable 100%
  • SPA 50%
  • SPA 100%
  • Armoured cable 25%
  • Armoured cable 50%
  • Armoured cable 75%
  • Armoured cable 100%
  • Land cable construction
  • Cable integration & test (load 1)
  • Cable integration & test (load 2)
  • Load 1 cable loading
  • Load 1 lay (Sydney to Samoa)
  • Load 2 cable loading
  • Load 2 lay (Samoa to California)
  • Total System Commissioning
  • SLTE vendor selection
  • SLTE vendor line testing
  • SLTE vendor line testing
  • SLTE vendor line test report